Here's the deal. On Clear Creek Schools, the claim was that crews stripped the copper and the radiators. Interior documentation showed the building was already stripped before anyone mobilized. $400,000 change order, gone. (Clear Creek Schools case study →)
That's the whole argument for this post. The moment crews walk in, everything that's missing, broken, or "never there to begin with" lands on the GC. The only thing that answers that is a record made before mobilization. Not after. Not from memory.
Everybody talks about the exterior baseline. Interior is the piece that's easy to skip. Grab the popcorn.
What I mean by interior documentation
Drones are starting to fly inside buildings, and some platforms have workflows for it. We still walk it. Interior documentation is a room-by-room record of the building's existing conditions, made before any construction starts, and how the data gets collected matters less than whether the record holds up. For unlit spaces, we bring the lighting to do it right.
You're after:
- 360° photos at every doorway, corridor turn, and room.
- High-res stills of anything that could end up in a dispute: radiators, copper, light fixtures, electrical panels, valves, HVAC terminals, flooring, millwork.
- Original files with the timestamp and camera data intact.
- A floor plan that ties every image set to a room.
- A folder structure somebody can actually read: floor, zone, room.
The value isn't the pretty photos. It's being able to say which room, which fixture, and when.
Why the exterior flight doesn't cover you
The exterior pre-con flight captures the site: road, curb, laydown yard, building footprint, existing grades. That's what handled the Severance Library road-damage claim. An $80,000 change order got split 50/50 because the baseline showed which damage was already there. The GC owed $40,000 instead of $80,000. (Severance Library case study →)
Interior is a different class of dispute:
- "The copper was there when you arrived."
- "The floors were perfect until your crews walked on them."
- "That HVAC terminal worked before mobilization."
- "These are the fixtures we paid for."
An ortho can't answer any of those. It shows the footprint. It doesn't show what's in room 214.
Two deliverables, same purpose, different evidence. Spec only the exterior and you're buying half the protection.
What to write into the scope
Fair warning, this next part is a fire hose. Grab your coffee.
An interior walk-through is unforgiving. Miss a room and that's the room somebody files over. Here's what I'd put in the scope.
Capture
- Capture method stated in the scope (walk-through, handheld, or drone), plus the path agreed before capture starts, including wings, basements, and mezzanines
- 360° at every room entry and corridor turn
- Close-ups of anything with dispute value, plus a wide shot of the room for context
- An image-naming convention that maps to the floor plan, like
F2-RM-214-RADIATOR-001
Metadata
- Original files only. No re-saving through editors that strip the timestamp and camera data
- A capture log: date, start and end time, who captured, which zones
- A floor plan marking the path and the image count for each room
Delivery
- Folder per floor and zone, with an index that maps each image to a room and fixture
- A one- or two-page summary: rooms documented, image count, and any existing damage or missing fixtures
- Delivery that records the date and the recipient
The clause that makes it count
Reference the interior package in the prime contract as the baseline for existing interior conditions. Without that clause, it's a nice-to-have. With it, any party can point to it when a change order cites interior conditions.
Two questions that separate real from marketing
Plenty of folks will sell you "interior documentation." Some of it is a pile of photos in a shared folder. Two questions sort it out fast.
1. "What's your naming convention, and where's it written down before the walk-through?"
"We name them after we upload" is the wrong answer. The file name is the link between the photo and the building. No convention, no link. Just a pile of files.
2. "How do you keep the metadata intact?"
"The photos have timestamps" isn't an answer. A lot of common workflows strip that data during processing or upload. If they can't tell you how it survives from camera to delivery, it won't hold up.
Where this doesn't apply
Interior documentation is for renovation and remodel work, where the contractor inherits existing conditions. On greenfield there's no building yet, so the pre-con deliverable is the exterior baseline.
It's also not a survey. It's an evidence record of existing interior conditions, captured before mobilization. It doesn't replace an as-built, and it isn't a licensed surveyor's record of boundary or topography. (The exterior pre-con RFP checklist covers the site and footprint clauses →)
Bottom line
Interior documentation is priced per building, and it's a small line item next to the change order it protects against. The exterior flight protects the site. The interior walk-through protects the building. Spec both and reference both in the prime contract.
So here's the challenge. Pull your last renovation RFP. If it doesn't call for an interior baseline, fix that before mobilization, not after the change order lands.
Related reading
- Clear Creek Schools case study →: the interior documentation that killed a $400,000 change order
- Severance Library case study →: the exterior baseline that cut an $80,000 road-damage claim in half
- The $400,000 Photo →: my account of the Clear Creek meeting
- The Pre-Construction Documentation RFP →: the exterior pre-con clause checklist
- The Day Drone Data Saved the Wall →: how flight data settles disputes nobody planned for
- Wet Dog Drones services →: documenting your site, from the ground up, inside and out
Data, orthomosaic imagery, elevation models, and maps provided by Wet Dog Drones are for informational, planning, and visualization purposes only. They do not constitute a legal land survey and should not be used to establish legal property boundaries or for certified engineering design without verification by a Licensed Professional Land Surveyor.
Written by Michael Lilley, Wet Dog Drones. FAA Part 107 certified (#4431708). 12+ years in the drone space, 5+ commercial. Operating across the Colorado Front Range, eastern plains, and western Kansas border.
Request Interior Documentation for Your Project