360° walk-throughs of every room, before crews arrive, during build-out and at turnover.

What the exterior flight can’t answer
Clear Creek Schools, on record
- Interior documented
- 84,000 sq ft
- Time on site
- 20 hours
- Change order killed
- $400,000
- “The copper was there when you arrived.”
- “The floors were perfect until your crews walked on them.”
- “That HVAC terminal worked before mobilization.”
- “These are the fixtures we paid for.”
What goes on record
Which room, which fixture, and when.
- 360° coverage
- Every doorway, corridor turn and room. We light unlit spaces.
- Dispute-prone items
- Radiators, copper, fixtures, panels, valves, HVAC terminals, flooring, millwork.
- Original files
- Timestamp and camera data intact.
- Floor plan index
- Every image tied to a room: floor, zone, room.
Questions GCs ask
- Do you fly drones inside?
- No. Every room is walked with 360° cameras.
- When should it happen?
- Before crews arrive, again during build-out, and at turnover.
- Isn’t the exterior flight enough?
- No. Interior disputes need their own record.