Construction Progress Monitoring & Drone Photography

Bi-weekly progress photos, orthomosaics, 3D models and side-by-side timelines for Colorado construction. Monthly after dry-in.

Douglas County ES 50 site graded, before the building The same view with steel and decking up
Douglas County ES 50, graded to steel up. Drag to compare.

Every flight delivers

Flown in the morning, on your desk before the next morning OAC meeting.

Orthomosaic
Georeferenced map of the whole site (GeoTIFF).
3D model
Mesh and point cloud (.las, .e57, .rcp).
Timeline comparison
Against the last flight and the baseline, with automated change detection.
Summary and archive
One-page PDF, plus every original image filed by date.

Construction progress photography

Pictures for the owner, measurements for the PM. Same flight.

Repeat angles
Automated missions fly the same route and camera angles every flight, so month three lines up with month one.
Time-lapse
Every flight strung together at closeout. Severance ran 16 months in 85 seconds.
Video
Flythroughs and footage your marketing team can use.
Dated record
Every original image filed by flight date. The metadata is the timestamp.

The cadence

Frequent enough to catch change, spaced enough to show it.

PhaseFlightsWhy
BaselineOnce, before mobilizationThe reference every later flight is compared to
Active constructionEvery two weeks until dry-inUtilities, structure and envelope change fastest here
Interior finishes to closeoutMonthlyKeeps the record complete without paying for flights that show nothing new

Severance Library, 16 months

30+ flights from groundbreaking to closeout, finished as an 85-second time-lapse.

Severance Library site as an empty lot
Lot
Severance Library framed, beside the existing building
Framing
Severance Library completed with parking
Complete

Read the Severance case

Questions GCs ask

Is this the same as construction drone photography?
It covers it. Every flight produces progress photos and video from repeat angles, plus the measurable map. The photos show the job; the orthomosaic proves it.
Why bi-weekly?
Weekly is overkill for most jobs and monthly misses too much. After dry-in, monthly keeps the record complete.
Does it work with Procore?
Yes. Deliverables drop into Procore, Autodesk (BIM 360, Revit) and your VDC workflow.
What else comes out of it?
Progress time-lapses, 3D flythroughs and footage your marketing team can use.

Stop guessing. Start documenting.

Every job is different

Send the address, start date and scope.

Pilot

FAA Part 107, insured